Select desired project below to access Plan Sets and Documentation
CONTACT [email protected] RE:PLAN SET INQUIRIES
PROJECTS CURRENTLY BIDDING
DLA Repairs to Building 67
02 - Amendments
- A001
- SP330024R0002+A0001
- A002
- ATTACHMENT+3+-+A0002+-+4232+Submittal+Register+Rev+01
- ATTACHMENT+4+-+A0002+-+BLDG+67+-+DDSP+ACM+Assessment+Extract
- SP330024R0002+AMENDMENT+0002+7-11-1014
- ATTACHMENT+1+-+A0002+-+Bldg+67+Revised+Dwgs
- ATTACHMENT+2+-+A0002+-+BLDG+67+-Orig+Constr+Extract
- OTHER
- Site+Visit+Notes+6-21-2024
- SP330024R0002+SITE+VIST+ATTENDANCE+SHEET
Expand Mental Health Clinic Construction - Wilkes-Barre VAMC
02 - Amendments
- A001
- Amendment+0001+Attachment+3+-VA+Signage+Design+Manual
- Amendment+0001+Attachment+4+-+Const+Wage+Determination+Luzern+6.28.24
- Amendment+0001+Attachment+5+-Site+Visit+SIgn+In+Sheet
- Amendment+0001+36C77624R0079
- Amendment+0001+Attachment+1+RFIs+-+Expand+Mental+Health+Wilkes-Barre+Final
- Amendment+0001+Attachment+2+-Adendum+01
- A002
- Amendment+0002+36C77624R0079
- Amendment+0002+Attachment+1+Additional+RFIs+7+9+24
- Amendment+0002+Attachment+2+6007+Wilkes-Barre+Geotechnical+Report
- ~$endment+0002+Attachment+1+Additional+RFIs+7+9+24
- A003
- Amendment+0003+36C77624R0079
- OTHER
- Attachment 6- Asbestos Reports - Wilkes-Barre
03 - Specifications
Renovate 9th Floor Mental Health Wilkes Barre VAMC
02 - Amendments
- A001
- 36C24424R0007+0001
- A002
- 220523+GenDut+ValvesPlumbPiping+MH+9th
- 221100+FacWaterDistr+MH
- Drawings+General
- Wilkes+Barre+PA+Campus+Site+Plan+crane+locations
- 01-20-083-pGen100
- 17-A15+Revisions+2024-05-30
- 17-E43+Revisions+2024-05-30
- 36C24424R0007+0002
- A003
- 1+000110+Table+of+Contents
- 2+Addendum+1+Drawings
- 3+SOLID+SURFACING+FABRICATIONS
- 4+Door+Hardware
- 5+ALUMINUM+CANOPY+SYSTEM
- 6+Noise+and+Vibration+Control
- 7+RFI+RESPONSES
- 8+A3+ICRA
- 9+17-H4+ICRA
- 10+01-A+ICRA
- 11+G-009+ICRA
- 12+ICRA
- 13+ICRA
03 - Specifications
05 - Wage Rates
LEB Construct New CLC Construction
02 - Amendments
- A001
- Amend+0001+-+Att+3+-+S02_595-601+Lebanon+CLC_Updated+Bid+Docs+Specs+Vol+II
- Amend+0001+-+Att+4+-+S02_595-601+Lebanon+CLC_Updated+Bid+Docs+Specs+Vol+III
- Amend+0001+-+Att+6+-+Limitations+on+Subcontracting
- Amend+0001+-+Att+7+-+Wage+Determination+4.24.24
- Amend+0001+-+Att+8+-+JAs+Combined+Redacted
- Amend+0001+-+36C77624R0026+0001
- Amend+0001+-+Att+1+-+S02_595-601+Lebannon+CLC_Updated+GI001
- Amend+0001+-+Att+2+-+S02_595-601+Lebanon+CLC_Updated+Bid+Docs+Specs+Vol+I
- A002
- Site+Visit+Sign-in+Sheet+6.24.24
- Amendment+0002+-+36C77624R0026+0002 (1)
04 - Drawings
- Att 1 - S02_595-601 Lebannon CLC_Updated GI001
- Att 5 - S02_Drawings_1
- Att 6 - S02_Drawings_1A
- Att 7 - S02_Drawings_2
- Att 8 - S02_Drawings_2A
- Att 9 - S02_Drawings_3
- Att 10 - S02_Drawings_3A
- Att 11 - S02_Drawings_4
- Att 12 - S02_Drawings_4A
- Att 13 - S02_Drawings_5
- Att 14 - S02_Drawings_5A
- Att 15 - S02_Drawings_6
- Att 16 - S02_Drawings_6A
- Att 17 - S02_Drawings_7
- Att 18 - S02_Drawings_7A
- Millwork-Lebanon CLC
05 - Wage Rates
PROJECTS CURRENTLY UNDER CONSTRUCTION
Hickory Run State Park-Latrine Improvements
01 - Solicitation
- 114-06 P1.1 Unit Price Schedule
- 211202 Geotech Supplement_Hickory Run_Camp Shehaqua
- 20030392 Hickory Run State Park - Geotech Report
- Administrative Procedures for Construction Contracts 2022 Edition
- Appendix M Standard Contract Provisions July 2022 (1)
- BidProtest(PROT)111622020942
- BidWithdrawal(BWITH)111622020947
- DGS Guidance Document
- Enhanced Min Wage 07 01 2022
- Finding SDBs and VBEs
- General Conditions to the Construction Contract 2022 Edition
- Instructions to Bidders 2022
- PREP-00001 - Bid Prep- .1 - General - Rev#1
- PREP-00002 - Bid Prep- .2 - HVAC - Rev#1
- PREP-00003 - Bid Prep- .3 - Plumbing - Rev#1
- PREP-00004 - Bid Prep- .4 - Electrical - Rev#1
- Public Works Employment Verification Form
- SDB Participation Packet Low Bid
- Standard Construction Contract and Contract Bond 2022
- VBE Participation Packet Low Bid
- Worker Protection Form Public Works
03 - Specifications
05 - Wage Rates
Heritage Center-Additions and Alterations
01-Solicitation
03-Specifications
05-Wage Rates
PHIL Install Radiology for ED 1st Floor
01-Solicitation
02-Ammendments
03-Specifications
05-Wage Rates
MART Building 405B Renovation
03 - Specifications
04 - Drawings
05 - Wage Rates
Hollidaysburg Veterans Home
01 - Solicitation
- 12 Revised Geotechnical Report
- Administrative Procedures for Construction Contracts 2022 Edition
- Appendix M Standard Contract Provisions July 2022
- BidProtest(PROT)101922032629
- BidWithdrawal(BWITH)101922032653
- Compliance with The Davis Bacon Act
- DGS Guidance Document
- Enhanced Min Wage 07 01 2022
- Federal Fund Certification DGS C-0969-0017 P1
- Finding SDBs and VBEs
- General Conditions to the Construction Contract 2022 Edition
- Instructions to Bidders 2022
- PREP-00001 - Bid Prep- .1 - General - Rev#0 - 11092022
- PREP-00002 - Bid Prep- .2 - HVAC - Rev#0 - 11092022
- PREP-00003 - Bid Prep- .3 - Plumbing - Rev#0 - 11092022
- PREP-00004 - Bid Prep- .4 - Electrical - Rev#0 - 11092022
- Public Works Employment Verification Form
- SDB Participation Packet Low Bid
- Standard Construction Contract and Contract Bond 2022
- Unit Price Schedule - 969-17
- VBE Participation Packet Low Bid
- Worker Protection Form Public Works
03 - Specifications
04 - Drawings
- Contact [email protected] for these documents.
05 - Wage Rates
WB Replace Flooring in Clinical Areas
01 - Solicitation
02 - Amendments
- SK3
- SK4
- SK5
- SK6
- SK7
- SK8
- SK9
- SOW - remove carpeting and flooring
- SOW - remove carpeting and flooring_1
- SOW - Remove carpeting-flooring 5-23
- VASealColors
- 7th floor bathrooms
- Epoxy Floor with Intergral Cove Base Govt Spec
- Everlast-Floor-specs
- Floor Profiles Data Sheet
- Floor Profiles Data Sheet_1
- Flooring Project Sketches SK1-SK9
- Flooring Project Sketches SK1-SK9_1
- SK1
- SK2
03 - Specifications
04 - Drawings
05 - Wage Rates
LEB Construct New Entry Bldg 17
01 - Solicitation
05 - Wage Rates
PHIL Flood Damage Repairs
01 - Solicitation
04 - Drawings
05 - Wage Rates
LEB Parking Lot Sealant & Joint Repair
01 - Solicitation
02 - Amendments
05 - Wage Rates
PA State Museum and State Archives - DGS
01 - Solicitation
- PREP-00001 - Bid Prep- .1 - General - Rev#0 - 01022024
- PREP-00002 - Bid Prep- .2 - HVAC - Rev#0 - 01022024
- PREP-00003 - Bid Prep- .3 - Plumbing - Rev#0 - 01022024
- PREP-00004 - Bid Prep- .4 - Electrical - Rev#0 - 01022024
- SDB Participation Packet 2023.05.05
- Standard Construction Contract and Contract Bond 2022
- VBE Participation Packet 2023.05.05
- Administrative Procedures for Construction Contracts 2022 Edition
- BidProtest(PROT)122723103035
- BidWithdrawal(BWITH)122723103043
- Finding SDBs and VBEs
- General Conditions to the Construction Contract 2022 Edition
- Instructions to Bidders 2022